Commercial & Industrial Solar
Cut operating cost and hedge tariff exposure without losing a minute of production. Roof-load verified, grid-compliant, GITA-optimised.
Solar PV · Battery Storage · Power & Security Infrastructure
EVOLTS Power Technologies designs, installs and maintains solar PV and battery energy storage systems for factories, commercial buildings and landed homes. Headquartered in Puchong, Selangor, serving Kuala Lumpur and the Klang Valley, with teams in Penang and Johor. Backed by 45 years of engineering heritage — and we lodge every TNB, Suruhanjaya Tenaga and Bomba submission ourselves.
Free drone roof survey · Engineer response within 1 working day · No obligation
Three routes, three very different engineering problems. Pick the one that matches your site.
Cut operating cost and hedge tariff exposure without losing a minute of production. Roof-load verified, grid-compliant, GITA-optimised.
Shave peak demand, ride through outages and stabilise supply to automated lines. Sized from your measured load profile, not a rule of thumb.
Battery energy storage systems
The no-quota scheme that replaced NEM Rakyat for new home installations in 2026. Bungalow, semi-D and corner terrace.
Three timing factors most Malaysian buyers only discover after they have lost a year to them.
That is roughly what a 500 kWp factory array would have generated. Delay it twelve months and you buy every one of those units from the grid instead.
NEM 3.0 closed on 30 June 2025. Homeowners planning around NEM need to re-plan around Solar ATAP — and should understand the difference before signing anything.
Your commissioning date decides which year of assessment the allowance falls into. Slipping a quarter can push the tax benefit a full year down the line. See how GITA works.
Most contractors deliver one layer. An industrial building needs four, and they have to work together.
Rooftop and ground-mount systems, designed from drone survey and roof-load analysis.
Solar energy systemsBESS for peak shaving, backup and grid stability — integrated with the array, not bolted on.
Battery storageUPS protecting critical loads where even a millisecond drop is unacceptable.
Power continuityCCTV, access control, parking and structured cabling across the same facility.
Security systemsData centres and automated factories need all four layers specified together. When they come from four different contractors, the integration risk sits with you. See how we scope a data centre.
Our EPC partners pioneered thermal hot-water systems before moving into solar PV. That lineage shows up in mounting detail and structural discipline.
See completed workEvery project starts with a 3D drone survey and a roof-loading calculation, so panel layout and structural risk are known before quotation.
How we surveyWe prepare and submit 100% of TNB, Suruhanjaya Tenaga and Bomba documentation. You are not chasing approvals.
Schemes and approvalsWe publish indicative pricing and show the GITA-adjusted payback before you commit capital.
Solar cost in MalaysiaEVOLTS is headquartered in Puchong, Selangor, covering Kuala Lumpur and the wider Klang Valley, with delivery teams in Penang to the north and Johor to the south — the three corridors carrying most of Malaysia’s manufacturing and data-centre load.
Serving Kuala Lumpur and the wider Klang Valley — commercial buildings, industrial parks and landed residential.
Solar in Kuala LumpurElectronics and semiconductor manufacturing across the mainland and island industrial zones.
Coverage & service areasJohor Bahru, Iskandar Puteri, Pasir Gudang and the Segamat–Labis–Yong Peng manufacturing belt.
Coverage & service areasIndicative pricing: commercial rooftop from RM 2.20/Wp, residential from RM 3.00/Wp installed, before incentives. Full pricing by system size →
Send your latest TNB bill and a photo of your roof. No site visit needed to get a real answer.
For most landed homes with bills above about RM 300 a month, and for almost any factory with daytime production, yes — Malaysian irradiance is high and commercial tariffs have been rising. The honest answer depends on your consumption pattern more than your roof, which is why we model it from your actual TNB bill rather than quoting a headline percentage. See real cost and payback figures.
Ask four things: is the company registered and SEDA-recognised; will they do a structural roof-load calculation before quoting; do they lodge the TNB, Suruhanjaya Tenaga and Bomba submissions themselves; and who services the system in year eight. A quotation that skips the structural survey is not cheaper — it has simply moved the risk to you.
We are headquartered in Kuala Lumpur and cover the Klang Valley directly, with delivery teams in Penang for the northern industrial corridor and Johor for the south. See coverage detail.
Physical installation is days for a home and weeks for a large commercial roof. The overall timeline is driven by TNB application and approval, which we prepare, lodge and track on your behalf. We give you an expected date range at quotation rather than after you have signed.
Nothing. Send a recent TNB bill and a photograph of your roof and an engineer will return an indicative system size, cost band and payback estimate at no charge. If you want to proceed, the drone roof survey and structural check are also free. Request an assessment.